Failure in small parts of buildings P6 + M8 in Ludwigsburg Wednesday 24th May 2023 19:08:57


During tradesmen's work, devices supplying small parts of the buildings with LAN and WLAN failed in the P6 + M8 buildings in Ludwigsburg. We hope that the craftsmen will be able to put the devices back into operation tomorrow. We are assuming power failures for the devices.

The measures of the craftsman are necessary so that we can also put our new device platform into operation in the next few weeks in the student village in Ludwigsburg.

We have replaced the devices as planned Yesterday with the new generation

The devices did not start up again after a short power failure. We will try to exchange the affected devices directly against our new platform tonight.