In PF1, two of our devices have failed since about 04:20 today. Due to the simultaneous failure, we directly assumed a power failure. We have now looked at this and our assumption seems to be confirmed.
The VSSW as landlord and provider of the power connection was informed by us and will look at the problem with the missing power in our equipment room as soon as possible.
Without electricity, we can unfortunately do nothing and must wait for a response from the VSSW.
In total, about 70 members are affected.